News:

Smirro has become its
own company
Read more...

Smirro shows itself at the
Intersolar trade fair
Read more...

Measure 2012:

Hannover Messe 
23.-27.04.2012
Hall: 026 l Stand: E14

BTA Barcelona
15.-18.05.2012
Hall: P5 l Stand: 205

       



Project Binsdorf

The concept of the innovative heating system using Smirro GmbH is based on an interplay between seasonal latent heat storage, electrical heat pumps and parabolic troughs. The parabolic troughs provide for the necessary heat energy during the transitional seasons by loading two buffer storage units of each 1500 litres from which the floor heating system is fed.
Read more...

Project Test Field

To extend the research and development capacities in the parabolic trough sector into higher temperatures, the project "High-Temperature Test Field" was launched during the second half of this year.

Read more...

Project ITW

In the summer of 2010, Smirro GmbH, in cooperation with the ITW Stuttgart and the company Invensor GmbH, launched its first project for solar cooling. For test purposes, the Invensor Company built an adsorption chiller, having a cooling capacity of 10 kW, into the existing building air conditioning.

Read more...